Year![Can be sorted ascending or descending](../icons/dblsort.gif) | Author(s)![Can be sorted ascending or descending](../icons/dblsort.gif) | ![](../icons/ecblank.gif) | Title![Can be sorted ascending or descending](../icons/dblsort.gif) | Report Title![Sorted descending, can be sorted ascending](../icons/dbldesc.gif) |
2002 | Whittington, J., Bunn, S., Cullen, P., Jones, G., Thoms, M., Quinn, G. and Walker, K. | ![Attachment Icon](../icons/vwicn005.gif) | Ecological assessment of flow management scenarios for the Lower Balonne | Report to the Queensland Department Natural Resources and Mines |
1997 | Thoms MC and Williams C | | Channel sedimentation below Pindari Dam | Report to the NSW Department of Land and Water Conservation, 64p |
1997 | Thoms MC | | Bank erosion in the Boggabilla Weir Pool | Report to the NSW Department of Land and Water Conservation, 64 p |
1998 | Bevitt R, Erskine W, Gillespie G, Harris J, Lake PS, Miner B and Varley I | | Expert Panel Environmental Flow Assessment of Various Rivers affected by the Snowy Mountains Scheme | Report to the NSW Department of Land and Water Conservation |
1999 | Thoms, M.C. | | The condition of the Namoi River system | Report to the NSW Department of Land and Water Conservation |
1999 | Coysh, J. and Norris, R. | | Waikato Region AUSRIVAS Trial | Report to the New Zealand Ministry for the Environment |
2001 | Norris, R., Liston, P., Davies, N., Coysh, J., Dyer, F., Linke, S., Prosser, I., Young, B. | | Snapshot of the Murray-Darling Basin River Condition | Report to the Murray-Darling Basin Commission |
2002 | Stewardson, M., Rutherfurd, I., Cottingham, P., Schreiber, S., and Ezzy, M. | | Evaluating the effectiveness habitat reconstruction in the Murray-Darling Basin | Report to the Murray-Darling Basin Commission |
2001 | Jones, G., Arthington, A., Hillman, T., Kingsford, R., McMahon, T., Walker, K., Whittington, J. and Cartwright, S. | | Independant Report of the Expert Reference Panel on Environmental Flows and Water Quality Requirements for the River Murray | Report to the MDBC |
2000 | Hillman, T.J., Koehn, J.D., Mitchell, D., Thompson, D., Sobels, J.D. and Woodside, D. | | The Murrumbidgee: Assessing the Health of a "Working River" | Report to the Irrigated Agribusiness Taskforce and the Department of Land and Water Conservation |
2001 | Jones, G., Whittington, J., Arthington, A., Lawrence, I., and Cartwright, S. | | Independant Assessment of the Environmental Achievements of the COAG water reforms | Report to the EPA |
2005 | Cottingham, P., Stewardson, M. and Webb, A. | ![Attachment Icon](../icons/vwicn005.gif) | Victorian Environmental Flows Monitoring and Assessment Program. Stage 1: Statewide Framework | Report to the Dept of Sustainability and Environment, Victoria |
1999 | Hillman, T., Thoms, M., Growns, J., Harris, J., Quinn, Q. and Cottingham, P. | | Woronora River environmental flows scoping study | Report to Sydney Water Corporation |
2000 | Sloane, P., Richard, R. | | Woronora Macroinvertebrate Study Design | Report to Sydney Catchment Authority |
1998 | Lawrence A.I. | | Development of Stormwater Quality Interception Devices Strategy, Brisbane City Council | Report to SKM |
1998 | Lawrence A.I. | | Design of Mango Hill Lake, Pine River | Report to SKM |
1997 | Breen, P.F. and Craigie, N.M. | | The use of wetlands for the treatment of irrigation return water | Report to Sinclair Knight Merz for Goulburn Murray Water |
1997 | Palmer M, Cowich A, Gibert J, Hyde K, Kairesabo J, Lake PS, Naiman R, Strayer D and Sabater F | | Freshwater domain: Sediments and biota | Report to SCOPE Workshop on Sediments and Biodiversity, Wageningen, The Netherlands |
1996 | Lawrence, I., Phillips, B. and Lawson, C. | | Redcliffe stormwater management scoping plan | Report to Redcliffe City Council |
1998 | Cullen, P. and Hillman, T. | | Assessment of the Nathan Dam Review Report | Report to Queensland Minister of Natural Resources |
1995 | Hart BT | | CRC for Freshwater Ecology, Water Quality and Ecological Assessment Program | Report to Program Review Committee. December 1995 |
1998 | Lawrence, A.I. | | Review of Dunlop Pond | Report to Planning and Land Management |
1996 | ANGKASA GHD SDN. BHD. | | Putrajaya Lake phase 1 concept design report - wetland component | Report to PJ Holdings SDN. BHD. |
1999 | Lawrence AI | | Review of SA Heathfield WWTP effluent standards | Report to Patawalonga Catchment Water Board |
1996 | Willing and Partners Pty Ltd | | Homebush Bay infrastructure development: Concept design of the eastern and southern WQCPs | Report to Olympic Coordination Authority |
1997 | Shiel RJ | | Rotifera and microcrustacea of NT billabongs | Report to NT Dept of Lands, Planning and Environment |
1998 | Nichols S and Norris R | | Biological monitoring of water quality in four streams in Kosciuszko National Parks, NSW, Monitoring period November 1997 to August 1998 | Report to NSW National Parks and Wildlife Service |
1999 | Nichols S and Norris R | | Thredbo River inspection - Job number - R4796 | Report to NSW National Parks and Wildlife Service |
1997 | Webster IT, Jones GJ, Oliver RL, Bormans M and Sherman BS | | Control strategies for cyanobacterial blooms in weir pools | Report to NRMS Grant No. M3116/CEM Technical Report No. 119 |
2001 | Whittington, et al. | | Development of relationships between flow regime and river health. CRC for Freshwater Ecology - outcomes of Clear Mountain Workshop | Report to Natural Resources and Mines |